Customization: | Available |
---|---|
CAS No.: | 9009-54-5 |
Formula: | CH3h8n2o |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our products |
Special features |
Typical Applications |
1. Intersections, ramps, turns, mountain roads, narrow roads, deceleration areas, greenways, sidewalks, bicycle lanes, bus lanes, parks, squares, scenic spots, etc. |
2. It can be directly bonded to the surface of asphalt, concrete, iron plate, wood and other materials. |
3. It is suitable for indoor and outdoor working areas in production, storage, parking lot and other places, and a smooth wear-resistant layer with crack bridging characteristics.
|
Technical Data Sheet |
PROPERTY | STANDARD/UNITS | VALUE-SP236 | |
Component | -- | Part A | Part B |
Appearance | Visual | Multiple colors | Dark brown liquid |
Ratio | Mass ratio | A:B=5:1 | |
Viscosity /mPa.s | GB/T 10247-2008 | 15000±5000 | 200±50 |
Data details after mixing | |||
Viscosity /mPa.s | GB/T 10247-2008 | 6000±1000 | |
Solid content | GB/T 2793-1995 | >99% | |
Operation time after mixing | GB/T 10247-2008 | >30 Min | |
Tack free time | GB/T 10247-2008 | <1h | |
Actual time | GB/T 10247-2008 | 24h | |
Hardness /Shore D | GB/T 531.1-2008 | >65 | |
Bonding strength with concrete | JT/T 712-2008 | ≥3 MPa | |
Slip resistance - dry wet friction coefficient | JT/T 712-2008 | >0.7 | |
Heat resistance | 80ºC | No change (cracking, peeling, peeling) | |
Freezing resistance | -30ºC | No change (cracking, peeling, peeling) | |
Acid resistance | 1% H2SO4 | No change after soaking for 15 days | |
Alkali resistance | Saturated Ca (OH) 2 | No change after soaking for 15 days | |
Shelf life | Month | 9 |
DIRECTIONS FOR USE |
After using
1. Clean the road surface First, use reflective cones or other warning barriers to enclose the road surface to be paved, then use a broom or road cleaner to clean the sundries and other garbage on the ground, and then use a blower to clean the dust on the ground. Note: the construction road surface shall not have water or moisture. The wet road surface will greatly reduce the adhesion of the colored road surface adhesive to road surface and seriously affect the bonding quality. |
2. Paste textured paper
Paste textured paper on the road according to the graphics design on the road.
Note: Textured paper must be attached to the outside of the graphic, not to the inside of the graphic, and it
must be pasted closely to the ground.
|
3. Mixing colored pavement adhesive Open the colored anti-skid pavement PART A and B, first use the mixer to mix the material, the mixing time is generally 60 seconds, then pour the PART B material into PART A, and use the mixer to mix, the mixing time is generally 90 seconds (depending on the weather conditions). Note: PART A and B must be mixed evenly, and the mixing time should not be too short or too long. A long time will cause the color pavement adhesive to solidify too quickly, which is not suitable for spreading, causing the color pavement adhesive to be scrapped or affecting the quality.
The dosage is 2.0-2.5 kg/ m2
|
4. Paving colored pavement adhesive
Pour the colored pavement adhesive on the ground to be applied and spread it with a long-hair roller.
Note: It is necessary to ensure that the colored pavement adhesive is evenly spread in the construction graphics. The colored pavement adhesive will be naturally self-leveling. The application staff should carefully check where the colored pavement adhesive is not evenly spread and try to ensure the thickness of the colored pavement adhesive is even. |
5. Throwing ceramic particles
The colored pavement adhesive is spread evenly while spraying ceramic particles.
Note: The ceramic particles should be sprayed evenly to completely cover the colored pavement adhesive. Because the conditions of various roads are different, it is necessary to repeatedly check whether the local colored road surface adhesive is not covered by the ceramic particles after the ceramic particles have been sprayed. In this case, the ceramic particles need to be sprayed again to achieve the effect of complete coverage. . In particular, it should be noted that the time from the mixing and spreading of the colored pavement adhesive to the completion of the ceramic particle spraying should be controlled within 15 minutes, otherwise it will affect the quality. (Dosage is 5-8 kg/ m2) |
6. Uncover the textured paper The masking paper must be removed within 15 minutes after the ceramic particles are scattered. Note: when the construction area is small, the masking paper should be uncovered immediately after the ceramic particles are scattered. If the time of uncovering the masking paper is delayed, the colored pavement adhesive left on the masking paper will solidify together with the materials in the figure, which is difficult to completely remove and affects the appearance. |
7. Recycling ceramic particles
About two hours after the ceramic particles are scattered, observe the solidification of the colored pavement adhesive. (generally, the color pavement adhesive can reach 90% solidification within 90 to 120 minutes, and the ceramic particle recycling operation can be carried out.) Note: ceramic particles mixed with garbage and sundries should not be recycled, let alone reused. |
8. After 4-6 hours of completion, the traffic can be released
Attention of operation
It is forbidden to apply under the condition of a wet base or high humidity circumstance
|
PACKING AND STORAGE
|
Package specification:
PART B: 4kg |
Storage: Sealed and stored in a dry, cool, dark, and well-ventilated place. It is recommended to operate in an environment with a temperature of 5-25 ºC and a humidity of ≤ 50% RH. |
Transportation:
moisture-proof, rainproof, sunproof, high-temperature roof, keep away
p from heat sources, handle with care, and do not squeeze or collide
|
Company Profile |
SEPNA focuses on the R&D and production of advanced new materials. Headquartered in Shanghai, the factory is located in Qidong High-tech Zone, Jiangsu Province. It is a modern technology factory with an area of 20000 square meters.
SEPNA factory uses an advanced MES automatic quality control system and a full-process ERP management system for strict quality control.
SEPNA factory and products have passed many international system certifications. Such as ISO9001-2015, SGS, 16949, and other certificates.
SEPNA adheres to the values of being "customer-centric, take technology as the blood, and focus on high-quality", adheres to the development concept of "DEVELOP DEPEND ON THE TECHNICAL INNOVATION, LIVE DEPEND ON THE QUALITY,"; Focus on providing customers with more accurate and safe products with "bonding, sealing and protection" functions.
SEPNA product lines, from flexible sealing, and fixed bonding to the development of multiple curing forms products, can fully match the production and manufacturing processes of different customers, and SEPNA can provide all customers with more options, higher efficiency, and better quality product solutions, as well as omnidirectional customized services and support.
SEPNA closely connects customers/suppliers/employees/partners with the mission of "Zero SL Bonds Us Together! ". And continues to promote technology and product innovation, service innovation, and talent innovation, better combine the value of products, services, and talents to make products more perfect, make industrial manufacturing more efficient, and provide more valuable products and service solutions for the high-end and high-end manufacturing industry!
Why Choose Us |
Our customers and Exhibition |
Certification |
About Transportation |
FAQ: |